BLOG

Pacific Flow Control completed a 48-inch Double Stop and Hot Taps on AWWA C301L PCCP Water Main in Saskatoon

Project Info

Category:

Tags:

Take a look at our latest project! Pacific Flow Control successfully completed a 48-inch Double Stop and Hot Taps on an AWWA C301L PCCP Water Main in Saskatoon.

Thanks to Hamm Construction Ltd for the great partnership!