BLOG

Preserving History While Protecting Infrastructure: Pacific Flow Control Completes Complex Double 30″ Line Stop on Vancouver Island PCCP Sewer Main

Pacific Flow Control Ltd recently completed a highly technical and environmentally sensitive double 30-inch (750mm) line stop on Hyprescon AWWA C301L concrete cylinder pipe (PCCP)—a critical sanitary sewer force main serving multiple communities on Vancouver Island. In addition to this dual isolation, our team also performed two 30×16 (750x400mm) hot taps to establish a high-capacity bypass system—keeping the main live and fully pressurized throughout construction, with zero flow

Explore Our Recent Projects and Services at Pacific Flow Control

Hello everyone, It’s been a while since our last update, but we’ve been busy delivering exceptional results for our clients. Today, we’re excited to showcase some recent projects in hot tapping, line stopping, and valve inserts. Langley 8×4 Hot Tap Canmore 6″ Single Line Stop Maple Ridge 12” Mueller Insert on DI At Pacific Flow Control, we specialize in providing