BLOG

The Flow Control Group of Companies Completes 42-Inch Wall Tap Through 15-Inch Thick Reservoir Wall

We recently completed a 42-inch wall tap through a 15-inch thick reinforced concrete reservoir wall in Ontario, Canada. Projects like this demonstrate how specialized pipeline and infrastructure services allow municipalities and utilities to safely modify critical systems while maintaining operational continuity throughout their communities. Reservoir wall taps are highly specialized operations that require precise planning, engineered fittings and equipment, and experienced technicians.

5 Mueller Valve Inserts Completed by Pacific Flow Control

Pacific Flow Control recently completed a valve insertion project in the City of Brandon. During this project, our team installed four 10-inch Mueller valve inserts and one 5-inch valve insert. Projects like this help municipalities improve control over their water systems while keeping the pipeline in service and minimizing disruptions to residents. What Is a Valve Insert A valve insert